(Construction)
Design and build of a new main brewery, 3 microbreweries and bottling plant on a greenfield site for Hepworth Brewery. The high specification construction involved resin coated power floated floors laid to falls into a bespoke marine grade stainless steel drainage system. (Duration: 9 Months)
Bulk Earthworks
Foundations and Oversites
Industrial Concrete Floors
Local Authority Adoptable Highway Access Work Sections 106 38 and 278
Package Pumping Stations
Porous Car Parks and Loading Yards
Sewage Treatment Plants
Stainless Steel Foul Water Drainage Systems
Steel Frame and Cladding
Surface Water Drainage Systems and Attenuation Systems