Supermarkets

(Construction)

Location: Waterlooville

The project was a two phased development on an existing brownfield site, the first phase involved construction of an estate road and a reinforced raft for McDonalds and external works. Highway retaining structures and Lidl were constructed in the second phase. (Duration: 12 Months)

Scope of Works

Asphalt and Macadam Surfacing

Bulk Earthworks

Concrete Structures

Foulwater Drainage Systems

Local Authority Adoptable Highway Access Work Sections 106 38 and 278

Reinforced Concrete Raft

Retaining Structures

Street Furniture Installation

Surface Water Drainage Systems