Structures

(Civil Engineering & Infrastructure)

Location: Petworth

Construction of a piled coffer dam in an area of SSI with timber deck suspended above, diversion of the surcharge through new box culverts under the highway, new concrete spillway clad in local stone and granite setts. (Duration: 6 months)

Scope of Works

Access Roads including Surfacing

Box Culverts

Bulk Earthworks

Concrete Structures

Natural Stone Paving

Natural Stone Walling

Permanent Piling Works

Reinforced Concrete Slabs

Retaining Structures

Timber Decking