Distribution Centres

(Construction)

Location: Hedge End

Construction of a new purpose built distribution Centre for DPD on an existing brownfield site. (Duration: 6 Months)

Scope of Works

Access Roads

Asphalt and Macadam Surfacing

Bulk Earthworks

Car Parks and Loading Yards

Foul Water Drainage Systems and Connections to Public Sewers

Foundations and Oversites

Loading Bays and Dock Levellers

Reinforced Concrete Roads and Slabs

Surface Water Drainage Systems and Attenuation Systems

Surface Water Drainage Systems and Soakaways